Ramada Inn Port Douglas installed Airius Aisle Series destratification fans to combat extreme heat in their reception area. The solution delivered immediate cooling, significantly improving staff and guest comfort, where traditional ceiling fans had previously failed.

Key Points:
  • 35°C+ Tropical Temperatures.
  • Simple, quick & cheap installation.
  • 80% Max Relative Humidity.
  • Cooling effects felt immediately.
  • 0-100% Speed Controllable.
  • Initially installed Ceiling Fans but they did not resolve the issue.
  • Comfort levels increased dramatically.

During the summer months temperatures in Northern Queensland can hit highs of 35°C and humidity can rise to as much as 80%. This can have negative consequences on most building environments, especially those with little or no airflow circulation. Even those with a designed or ad hoc cooling solution can fail to achieve sufficient levels of cooling in these conditions.

This was the situation the Management at The Ramada Hotel Port Douglas found themselves in. In an attempt to resolve the severe over-heating issue the hotel was experiencing in its Reception area the Hotel had installed paddle fans above the counters.

Not only did the paddle fans prove ineffective at providing cooling or circulating sufficient airflow during extreme temperatures, but even during average conditions they were not providing any benefit.

Following discussion with the team at Airius the Hotel Management agreed to trial a single Airius Narrow Aisle unit behind the counter to see if Airius could resolve their over-heating problem.

Not only did the paddle fans prove ineffective at providing cooling or circulating sufficient airflow during extreme temperatures, but even during average conditions they were not providing any benefit. Not only did the paddle fans prove ineffective at providing cooling or circulating sufficient airflow during extreme temperatures, but even during average conditions they were not providing any benefit.

The trial was such a success that within a week the Hotel had ordered another 4 Narrow Aisle units to install in their Reception area.

The units were installed within only a few hours, positioned above each work station along the counter. Each unit was then angled to supply airflow and cooling direct to both staff and customer when at the Reception Counter, providing the much needed and long awaited relief the Hotel has been looking for.